The adhesive forms a "crust" on its surface

The manufacturers can give an open working and drying time of the surface of the adhesive mixture, measured in laboratory conditions at a temperature of 22-23Celsius, with 50% relative humidity and without ventilation. Depending on the worksite’s current conditions, we "apply" a quantity of adhesive so that we can cover the adhesive surface with tiles within 8-15 minutes (depending on the type of adhesive and the conditions) before its surface gets dry.

We’ve noticed that the air streams flowing in the worksite and air in general are mostly responsible for the drying of the adhesive surface.

See more solutions

The plaster is not absorbing
A.The substrate is wet or there was excessive…
The plaster is detached while it has resistances
A. Not right or not at all preparations…
Excessive mixture consummation
Extended time of stirring the mixture in the…